• Mobile: +86 153 7387 2353 info@wcrete.com
Structural Strengthening Concrete Repair Admixture Solution
Surface Treatment
Home - Products - Concrete Repair - Surface Treatment - T80 silane impregnant

T80 silane impregnant

Long-lasting permeability protective silane-based water repellent- Isooctyltriethoxysilane

T80 silane cream material is especially suitable for concrete structure protection in chloride environment and freeze-thaw environment

GENERAL

T80 silane cream is designed to penetrate deeply into concrete so as to afford optimum protection against absorption of water and pollutants as well as freeze / thaw cycles, which can significantly improve the durability and service life of the structure. Such as marine bridges and harbor terminals subject to seawater corrosion and freeze-thaw damage, highways and urban elevated roads, overpasses and automobile depots subject to de-icing salt erosion, high-grade commercial buildings, sewage sedimentation treatment ponds of sewage treatment plants and other concrete structures.


Application

The product can be used for both new concrete structure protection and old concrete building reinforcement and repair.

Concrete component protection of harbor terminals, marine concrete protection of cross-sea bridges,

Concrete structure protection of highway bridges, elevated bridges, high performance concrete, tunnels, uclear power plant and soil

FEATURE

Excellent water resistance and alkali resistance. Water absorption ratio <7.5%, soaked by 0.1MNaOH solution for 24h, its water absorption ratio <10%.

Strong resistance to freeze-thaw cycles. For the concrete with water-cement ratio of 0.7, after the T80 treatment, the number of freeze-thaw cycles is at least 25 times more than the benchmark concrete.

Thixotropic materials. It has less material waste when working inside and on the top of surface, while increasing the residence time of materials on the concrete surface to achieve better penetration

It is easy to apply and can be reapplied.

PERFORMANCE

With excellent permeability, its penetration depth is significantly related to the quality of concrete and the amount of coating, and its specific depth can be referred to as shown in Table 1.


Table 1 The relationship between penetration depth of strong penetration cream and concrete quality and amount of coating


Concrete Strength No.Penetration Depth / mm
Coating AmountCoating AmountCoating Amount
180~200g/m2280~300g/m2550~600g/m2
C1581516
C2561214
C3551013
C454810


The ideal resistance to chloride ion penetration can effectively reduce chloride ion penetration by more than 90%.


T80 silane cream


T80 silane cream


● A stable reticulated silicone structure is produced by chemical reaction with concrete, so the service life is the same as that of the concrete being protected.

Water adding

concrete

T80 silane cream


Table 2 performance evaluation of T80 strong penetration cream concrete protective material
ItemTechnical index
Technical indexOTEOS
Active ingredient content>80%
SmellNo obvious irritating odor or slight ethanol odor
Density (25℃) (g/m3)0.9 ± 0.1
PH Level7 ± 1
Chloride content (%)<100
Aridity coefficient (%)>30
Water absorption (%)<7.5
Alkali-resistant (%)Water absorption after alkali treatment is less than 10
Reduction rate of chloride absorption (%)>90
Penetration depth (mm)≤C45Concrete3 ~ 5
>C45Concrete2 ~ 3
Salt scaling resistanceW/C=0.7 ConcreteAt least 25 times more in salt solution with reference concrete


Package:

Supplied in 20kg plastic drums, sealed in a cool place with a shelf life of 1 year from the date of manufacture.


Construction process

1. Age of concrete:

The age of the treated concrete should be not less than 28 days, or not less than 14 days after repair. In order to ensure the effect of silane impregnation treatment, the surface should be as dry as possible to achieve the best penetration effect.


2. Usage and dosage:

The maximum dosage can be 300g/m2 construction, the specific dosage is determined according to the design requirements and the absorption capacity of concrete.


3. Construction equipment:

Large area construction is recommended to use airless spraying equipment, high efficiency, low loss; small area construction can use brush or scraper.


4. Maintenance:

At least 24 hours after the construction of silane to ensure that no rain, natural air dry; to ensure the ideal treatment effect, the surface should be kept dry for at least 36 hours in summer, and at least 72 hours in winter.

Tags: silane cream hydrophobic impregnating / Concrete Repair / Rust Inhibitor / Silicone waterproofing coating / Concrete Repair / Structural strengthening / structrual repair /
Related Products


      


      

    

Project View More

Contact Us

Copyright ©Sino-sina Building Materials Co., Ltd. Limited All Rights Reserved | Sitemap