• Mobile: +86 153 7387 2353 info@wcrete.com
Structural Strengthening Concrete Repair Admixture Solution
Waterproofing
Home - Solution - Waterproofing - FYT high polymer modified asphalt waterproof coating

FYT high polymer modified asphalt waterproof coating

FYT high polymer modified asphalt waterproof coating is a new type of composite waterproof coating, which is produced by using domestic and imported petroleum asphalt as the main raw materials, surfactant and a variety of chemical additives as auxiliary raw materials, and then adding an increased dose of polymer for modification.


GENERAL

FYT high polymer modified asphalt waterproof coating is a new type of composite waterproof coating, which is produced by using domestic and imported petroleum asphalt as the main raw materials, surfactant and a variety of chemical additives as auxiliary raw materials, and then adding an increased dose of polymer for modification.


FEATURE

Product characteristics

◆The construction process is simple. Mechanical spraying or manual brushing can be used for construction, with fast drying and short construction period.

◆The cost of the waterproof layer is cheap, and the construction achieves the waterproof effect of the bridge deck.

◆The waterproof layer is firmly bonded with the base course and the commercial port asphalt concrete.

 FYT high polymer modified asphalt waterproof coating

PERFORMANCE

Performance  JC/T 975 Waterproof Coatings for Roads and Bridges

Serial number
ItemI
II
1
Solid content a/% ≥45
50
2
Surface drying time a/h≤
4
3
Dry time a/ h ≤
8
4
Heat resistance/℃140No flowing, sliding and dripping160
5
Impermeability / 0.3MPa, 30min
Impervious
6
Low temperature flexibility/℃-15No wrinkles-25
7
Tensile strength/MPa ≥0.50
1.00
8
Elongation at break/%≥
800
9Salt treatmentTensile strength retention/%≥
80
Elongation at break/%≥
800
Low temperature flexibility/℃-10No wrinkles-20
Mass increase /%≤
2.0
10Thermal agingTensile strength retention/%≥-1080-20
Elongation at break/%≥600
Low temperature flexibility/℃No winkles
Heating expansion rate /%≤1.0
Mass increase /%≤1.0
11
Coating and cement concrete ≥0.40
0.60

Matters needing attention

◆Before painting, the barreled paint shall be stirred evenly.

◆Coating dosage: 1.5kg ~ 3kg/m2, and the film thickness is generally 0.5mm-0.7mm.

◆The construction temperature should be 0-35 ℃, and it is not suitable for construction in rainy days and freezing periods.

◆Machine spraying or roller coating.

Packaging and storage

Packed in barrels, the weight of each barrel is 20kg/barrel, and the storage period is 6 months under normal storage and transportation conditions.


Related Solution

      

      
    
Related Products

      

      
    

Project View More

Contact Us

Copyright ©Sino-sina Building Materials Co., Ltd. Limited All Rights Reserved | Sitemap