Post-grout for assemble concrete tower

Post-grout for assemble concrete tower is consisted of special cement, expansion composition, early strength composition, plasticization composition and other materials. It is characterized by fast strength development, fast flow speed, no shrinkage, anti-corrosion and rust resistance, low water binder ratio, no bottom sinking, easy harmony and strong adhesion. This product is suitable for post tensioned prestressed bridge duct grouting of all kinds of Railways and highways, Duct grouting of large prestressed structures, leakage stopping grouting at various structural joints, curtain grouting, anchor grouting, gap filling or repair, etc.


GENERAL

Post-grout for assemble concrete tower is consisted of special cement, expansion composition, early strength composition, plasticization composition and other materials. It is characterized by fast strength development, fast flow speed, no shrinkage, anti-corrosion and rust resistance, low water binder ratio, no bottom sinking, easy harmony and strong adhesion. This product is suitable for post tensioned prestressed bridge duct grouting of all kinds of Railways and highways, Duct grouting of large prestressed structures, leakage stopping grouting at various structural joints, curtain grouting, anchor grouting, gap filling or repair, etc.


FEATURE

Product features

◆Good fluidity, no bleeding and no stratification

◆Full grouting, early strength and slight expansion

◆It can be used for one-time grouting construction, the slurry in the pipeline is dense without pores

◆The prestressed reinforcement is not rusted, and is firmly bonded to the concrete

Scope of application

◆This product is applicable to the construction of post tensioned bonded prestressed concrete duct grouting materials for large-scale projects such as railway, highway, bridge, nuclear power plant, onshore wind turbine assembly concrete tower and so on;

◆Pipeline grouting construction to improve construction speed under low temperature conditions;

◆Pipeline grouting construction at ambient temperature above 10 ℃ without curing;

◆Pipeline grouting construction under appropriate curing conditions and above 20 ℃;

PERFORMANCE

Performance

JTG/T3650-2020 Technical Code for Construction of Highway Bridges and Culverts /T/CEC 5008-2018 Technical Code for Prestressed Fabricated Concrete Tower of Wind Turbine Generator Unit

Testing item
Performance metrics
Water binder ratio (%)/0.26 ~ 0.28
Setting time (H)Initial setting≥5
Final setting≤24
Fluidity (s)Initial mobility10~17
30min fluidity10~20
60min fluidity10~25
Bleeding rate (%)3h bleeding rate0
3h steel wire bleeding rate0
Pressure bleeding rate (%)0.22MPa (when the vertical height of the duct is ≤ 1.8m)≤2.0 
0.36MPa (when the vertical height of the duct is > 1.8m)
Free expansion rate (%)3h0 ~2
24h0 ~3
Filling degree (%)QualifiedQualified
Compressive strength (MPa)3d≥25
7d≥35
28d≥80
Flexural strength (MPa)3d≥5
7d≥6
28d≥10
Corrosion to reinforcement
No corrosion
Gas content,%//

Construction process

◆Weigh components A and B accurately according to the recommended mixing proportion in a clean container, and stir them into uniform color and luster.

◆When less mixing is required, the putty knife can be used to mix directly on the wood or glass plate.

◆When a large amount of glue is required, it is recommended to use mixing machinery to mix and ensure that the edge and bottom of the container are completely mixed evenly.

Packaging and storage

Packed in PP bags, 25kg/bag. Store in a ventilated and dry place and it’s storage period is 3 months.